Health Care
We started this complete renovation with a roughly 100 year old house/family doctors office and transformed the space into a new dental practice. When working on a structure of this age, we faced many construction challenges and through methodical thinking and perseverance, we were able to overcome and execute. In addition to the renovation, we installed an entirely brand new upgraded HVAC system and completely new electrical system.
North Shore Physicians Group is expanding their space over into what was Safelite auto glass. We started construction on Phase 1 of this project in April 2022 and we are breaking through into the existing space now as a transition of phase 1 to phase 2. Phase 2 involves doing some renovations/updates over in the existing clinical practice space.
The south entrance was constructed with an intrecal automated door system along with a new heating and air conditioning systems which where calibrated to keep the entry conditioned while maintaining a consistent temperature in the corridors of the hospital. The entrance was also constructed during the cold weather season.
The three phase project began with the construction of 5 new offices and relocating the existing medical staff and administrators. Phase two was the construction of 11 new exam rooms with a new blood draw room and new reception area. Phase three was the complete renovation of the nurse’s call station. All three phases were completed without any patient disruptions.
R.C. Griffin, Inc. has completed a number of dialysis clinics in the local area including Saugus, Methuen, Marlborough MA. and Portsmouth NH. Some of the projects were new clinics, and others were renovations which required coordination while patients received treatment. R.C. Griffin, Inc. works with the owner to design and install the latest technology at each clinic in order to accelerate the construction schedule. RC. Griffin Inc. has met or exceeded the aggressive scheduling for each project.